Delivering Results With Precision Every Time

Vector 32

Explore how All Digital Solutions brings your vision to life with measurable outcomes and flawless execution

Measurable Benefits

Elevating construction outcomes through:
25%

Reduction in Rework

Precision modelling prevents costly errors

20%

Faster Timelines

Streamlined workflows save valuable time

Improved Stakeholder Communication

Improved Stakeholder Communication

Collaborative 3D visualisation aligns every team

Featured Projects

Sunshine Coast University Hospital

Sunshine Coast University Hospital

Challenge: Heavily congested services zones within the main hospital building plantroom due to limited building envelope

Solution: 45,000 clashes highlighted and resolved during coordination process

Outcome:

  • All trades held to a high standard of accuracy for their respective installations due to the congested nature of the build
  • Project success with all trades installing their works within their allocated timeframes and no on site issues were highlighted during the installation phase

Sunshine Plaza Extension

Challenge: Ensuring services construction issue documentation was well ahead of the structural teams concrete pour sequence

Solution: We were engaged early on in the contractor engagement process which enabled us to highlight three key areas of which had extensive design issues

Outcome: All services drawings issued well ahead of the concrete pour sequence which eliminated any delays on site when the structural team opened up areas for trades installation

Sunshine Plaza
Medical

Medical Facility AHU replacement

Challenge:

  • Short time frame for replacement of existing AHU’s with new AHU’s
  • No time for remaking ductwork or ordering site measures due to limited crane time

Solution:

  • Complete 3D scan of existing AHU platform and plant deck
  • Once the 3D modelling was completed, a buildability assessment was completed to ensure that there were no clashes with existing elements or any issues with the buildability of what had been provided by the modelling team.

Outcome:

  • AHU’s and duct work replaced within the tight timeframes set by the client to allow their facility to be back up and running with limited down time
  • No remakes or site measures were required for this project

Industry Applications

Our digital solutions deliver excellence across a variety of sectors:

Let’s turn your challenges into success stories.